{"id":13798,"date":"2024-03-20T15:28:13","date_gmt":"2024-03-20T13:28:13","guid":{"rendered":"https:\/\/verde-tec.gr\/%ce%b1%ce%b3%cf%81%ce%bf%ce%bc%ce%b5%ce%b8%ce%b1%ce%bd%ce%b9%ce%bf-%ce%b5%ce%bb%ce%bb%ce%b1%ce%b4%ce%bf%cf%83-%ce%b1%ce%b5\/"},"modified":"2024-03-20T15:30:00","modified_gmt":"2024-03-20T13:30:00","slug":"agromethane-hellas-sa","status":"publish","type":"post","link":"https:\/\/verde-tec.gr\/en\/agromethane-hellas-sa\/","title":{"rendered":"AGROMETHANE HELLAS SA"},"content":{"rendered":"<p class=\"p1\"><b>\u03a5ear of Establishment:<\/b> 2022<\/p>\n<p class=\"p1\"><b>Address:<\/b> 15A, G. Sissini str., Athens, <strong>P.C.:<\/strong> 115 28, Greece<\/p>\n<p class=\"p1\"><b>\u03a4el.:<\/b> + 30 210 5553281<\/p>\n<p class=\"p1\"><b>Web Site:<\/b> <a href=\"http:\/\/www.susteng.gr\" target=\"_blank\" rel=\"noopener\">www.susteng.gr<\/a><\/p>\n<p class=\"p1\"><b>e-mail: <\/b><a href=\"mailto:costias@susteng.gr\">costias@susteng.gr<\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\">Conversion of biogas-to-power plants for biomethane production<\/p>\n<p class=\"p1\">The conversion of biogas-to-power plants for biomethane production, like any expansion or upgrading project, requires a complex study that will address both the interconnection of the new upgrading plant (separation of biogas into its two main components) with the existing anaerobic digestion plant and the transmission-transportation of the final product to the natural gas grids or the final consumers.<\/p>\n<p class=\"p1\"><b>AGROMETHANE GREECE<\/b> can undertake and execute the entire range of activities required for the conversion of a biogas-to-power plant to a biomethane or hybrid plant:<\/p>\n<ul>\n<li class=\"p1\">Study of the most suitable transport solution for the location of the biomethane plant through physical or &#8220;virtual&#8221; (tanker transport) pipelines.<\/li>\n<li class=\"p1\">Selection of optimal upgrade technology, based on the characteristics of the biogas produced and the injection requirements into the grid.<\/li>\n<li class=\"p1\">Minimization of auxiliary energy costs (electrical \u2013 thermal).<\/li>\n<li class=\"p1\">Design of relevant systems.<\/li>\n<li class=\"p1\">Preliminary site studies.<\/li>\n<li class=\"p1\">Documentation of technical and economic feasibility.<\/li>\n<li class=\"p1\">Review of environmental impact studies and construction and production permits.<\/li>\n<\/ul>\n<p class=\"p1\">Similar services are required for the implementation of new biomethane plants.<\/p>\n<p class=\"p1\"><b>Contact Person:<\/b> K. Alexandridis<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Conversion of biogas-to-power plants for biomethane production<br \/>\nThe conversion of biogas-to-power plants for biomethane production, like any expansion or upgrading project, requires a complex study that will address both the interconnection of the new upgrading plant (separation of biogas into its two main components) with the existing anaerobic digestion plant and the transmission-transportation of the final product to the natural gas grids or the final consumers.<\/p>\n","protected":false},"author":3,"featured_media":13796,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[65],"tags":[],"class_list":["post-13798","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-participations-verde-tec-2024","category-65","description-off"],"_links":{"self":[{"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/posts\/13798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/comments?post=13798"}],"version-history":[{"count":2,"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/posts\/13798\/revisions"}],"predecessor-version":[{"id":13800,"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/posts\/13798\/revisions\/13800"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/media\/13796"}],"wp:attachment":[{"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/media?parent=13798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/categories?post=13798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/verde-tec.gr\/en\/wp-json\/wp\/v2\/tags?post=13798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}